Princess Alexandra Hospital – Adult Assessment Unit
Actiform handled all planning applications and Building Control throughout and the new building was delivered in accordance with HTM/HBN guidelines.
Project
Adult Assessment Unit
Client
Princess Alexandra Hospital
Contract
Adult Assessment Unit
Site Programme
12 weeks / 16 weeks
We were first appointed to deliver an Adult Assessment Unit, a two storey modular building which connected into the existing hospital.
The ground floor consisted of the main entrance, consulting rooms, procedure and ultrasound rooms and a large open plan assessment ward.
The 1st floor included 6 x 4 bed wards and 4 x single bedrooms, all with en-suite facilities. Both floors required large nurse stations.
This project included plant rooms on each floor so sound attenuating measures were designed into the structure and the air handling systems.
Working on live sites and stakeholder engagement
One of the key challenges with all these projects was ensuring hospital staff, patients, members of the public and other individuals could maintain access to the nearby buildings at all times; and there was no disruption to the operations of the hospital.
We were able to do this through the development of clear access plans, logistics plans, and delivery programmes which considered other hospital users and their needs
at the offset. All decisions taken by Actiform throughout the design and delivery of the project required approval from the Trust before implementation.
Our comprehensive stakeholder engagement during the initial stages of the project was an essential process for us to identify specific access requirements, considerations and related challenges that we may not have thought of, and consequently included them in plans.
This project was ongoing throughout the COVID 19 pandemic when all hospitals were at maximum capacity and needed extra ward space quickly. Due to this we managed to have the 1st floor and the link ready to accept COVID patients, ahead of schedule, despite having our own COVID outbreak at headquarters resulting in a 2-week shut down of our factory. This is an example of where we have effectively utilised our Business Continuity Plan.