UKAEA
We designed and constructed new two storey office block to provide UKAEA Cleaning Contractor accommodation.
Project
UKAEA
Client
UKAEA Cleaning Contractor
Contract
A permanent 440m2 two-storey, modular, mixed-use building.
Project Description
As part of wider long term regeneration scheme Actiform were appointed through a successful competitive tender process to design, manufacture and deliver a permanent two storey modular mixed-use building.
The facility, which is 440m2, is home to the expert cleaning departments that operate at the Culham site containing The Tokamak, a machine designed to harness the energy of fusion.
This new facility encompasses mixed use office spaces, large shared and open plan dining and staff break out spaces, as well as a training facility and cleaners’ areas.
The certificate for the new building is yet to be issued but is confirmed to achieve at least Excellent if not Outstanding.
Our works also included the installation of all foundations and services appertaining to this and the hard landscaping include ramps, external steps, and bike shelters, PV Solar.
Client Brief
The design and construction of a new two storey office block to provide UKAEA Cleaning Contractor accommodation on the Culham Site on a previously green field site. Consisting of:-
- Erect site hoarding
- Provide new supply services and waste services to the site.
- Install new foundations.
- Design of facility
- Manufacture of facility
- Construct internal and external structures.
- First and second fix M&E services
- Install internal and external finishes.
- Undertake local hard landscaping works
- Commission all service installations
- Achieve a BREEAM certification of very good or Excellent
- Provide all O&M and H&S record documentation.
I can honestly say in the 15 years I have been acting as an assessor you are the most proactive main contractor I have worked with. As an assessment organisation we have assessed hundreds of projects, and this has to be the smoothest project we have worked on. We look forward to working with you on future projects and continuing this successful working relationship.
Glenn Miles, Director at Encon Associates
The Result
A NET ZERO BUILDING!
Although the project was completed towards the end of 2023, the BREEAM certificate is awaiting issue however it shows we achieved a rating of Outstanding (this will not be confirmed until issued). It is confirmed to achieve at least Excellent.