Skip to content

Healthcare

M3

Actiform designed and delivered a comprehensive on-site accommodation complex for the M3 motorway project on behalf of client Balfour Beatty. Completed in 11 weeks, the £2.5M contract provided safe, functional, and high-specification offices and welfare facilities for site teams working across the motorway programme — setting a benchmark for what Actiform now considers standard on-site accommodation.

Expertise
  • Modular on-site accommodation design and build
  • Office and welfare facility specification
  • Multi-floor compound planning
  • DDA-compliant design
  • Fit-out and integrated services installation
  • Fast-track programme delivery
Deliverables
  • Multi-unit modular office and welfare complex
  • LED lighting panels with PIR detectors throughout
  • Air conditioning with central controllers
  • Fitted kitchens with integrated appliances
  • DDA-compliant WC and kitchen facilities
  • Boiler-fed showers with concealed pipework
  • Dehumidifiers to dry rooms
  • Multi-faith WC and prayer room facilities
  • Automatic sliding auto-open doors
  • Quality toilet cubicle and vanity units
  • Glazed partition panels and roof lights
  • Durable high-quality wall, floor and ceiling finishes
  • Folding/stacking wall systems

Challenge

Solution

  1. 01/

    Challenge

    Motorway construction projects demand on-site accommodation that can be mobilised quickly, without compromising on the quality and range of facilities needed to support large, long-term site teams.

    Solution

    Actiform delivered the full compound within an 11-week site programme, providing a complete suite of office and welfare buildings that met all operational requirements from day one.

  2. 02/

    Challenge

    Site teams working on major infrastructure programmes require welfare provisions that go beyond basic facilities — including DDA accessibility, faith-sensitive amenities, and dedicated drying and shower facilities.

    Solution

    The M3 accommodation was specified to include DDA-compliant WC and kitchen areas, multi-faith WC and prayer room facilities, boiler-fed showers with concealed pipework, and dehumidifier-equipped dry rooms — covering the full welfare needs of a diverse site workforce.

  3. 03/

    Challenge

    The scale and complexity of an on-site compound for a major motorway project requires flexible internal layouts that can be reconfigured as the programme evolves.

    Solution

    Folding/stacking wall systems and glazed partition panels were incorporated throughout, enabling spaces to be adapted to changing team sizes and operational requirements over the course of the programme.

Our Approach

The M3 project was approached as a fully integrated design-and-build commission, with Actiform taking responsibility for every element of the accommodation from initial specification through to on-site installation. Working directly with Balfour Beatty, the team developed a compound layout that prioritised both operational efficiency and day-to-day welfare for site personnel.

Specification decisions were driven by the long-term nature of motorway construction programmes. Rather than opting for standard temporary accommodation, Actiform specified finishes and features — from LED lighting with PIR detection to fitted kitchens and quality sanitary ware — that would maintain comfort and functionality throughout an extended site occupation.

The 11-week programme demanded precise coordination between manufacturing, logistics, and on-site installation teams. The compound was delivered on schedule, with all mechanical, electrical, and fit-out elements completed and operational at handover. The features and standards developed for M3 have since become part of Actiform’s baseline specification for on-site accommodation across similar infrastructure contracts.

The Results

£2.5mProject value

11Weeks, site programme

100%Functionality

Working closely with our estates and clinical leads, Actiform supported the design and build of a new modular emergency care unit at Princess Alexandra Hospital, Harlow. The team helped us move away from traditional, siloed structures towards a flexible, technology-enabled space, working hand in hand with our design team to deliver a future-focused build, fully integrated into hospital operations.

Pasqualino Risi

Associate director of Estates and Facilities, Princess Alexandra Hospital NHS Trust