Case Studies
Solving complexity at scale.
Defence
Design, manufacture and delivery of purpose-built 100m range facilities
Healthcare
A three-storey workplace, built off site and installed inside a live secure facility.
Defence
A three-storey workplace, built off site and installed inside a live secure facility.
Healthcare
A £17.8m diagnostic centre, manufactured and installed in three months
Healthcare
One project became ten. £14m of NHS transformation, delivered in 18 months.
Healthcare
Delivered during a pandemic. Ahead of schedule. Despite a factory shutdown.
Healthcare
Not every project starts from scratch. Sometimes the most important work is getting an existing building right.
Healthcare
A place for the people who never stop. Built in 14 weeks, without disturbing a single premature baby.
Healthcare
The carbon neutral endoscopy unit that goes where patients are — not the other way around.
Healthcare
60 beds. 78 modules. A new way to assess patients — without adding pressure to A&E.