Solving complexity at scale.

Photo of Actiform Project Specialist Ballistic Training Facility

Defence

Specialist Ballistic Training Facility

Design, manufacture and delivery of purpose-built 100m range facilities

  • Purpose-designed 100m ballistic range facilities
  • Specialist modular design
  • Off-site manufacture
Read more
Photo of Actiform Project Walton Community Diagnostic Centre

Healthcare

Walton Community Diagnostic Centre

A three-storey workplace, built off site and installed inside a live secure facility.

  • £5.2M
  • August 2025
  • Derbyshire
Read more
Photo of Actiform Project Three-Storey Modular Office Facility

Defence

Three-Storey Modular Office Facility

A three-storey workplace, built off site and installed inside a live secure facility.

  • Defence and Nuclear
  • Confidential Client
Read more
Photo of Actiform Project Bridgwater Community Diagnostic Centre

Healthcare

Bridgwater Community Diagnostic Centre

A £17.8m diagnostic centre, manufactured and installed in three months

  • £17.8m
  • 3 months to complete
  • Somerset
Read more
Photo of Actiform Project Princess Alexandra Hospital

Healthcare

Princess Alexandra Hospital

One project became ten. £14m of NHS transformation, delivered in 18 months.

  • £14m
  • Delivered in 18 months
  • Harlow
Read more
Photo of Actiform Project Princess Alexandra Hospital – Adult Assessment Unit

Healthcare

Princess Alexandra Hospital – Adult Assessment Unit

Delivered during a pandemic. Ahead of schedule. Despite a factory shutdown.

  • 24 inpatient beds
  • Harlow
Read more
Photo of Actiform Project Princess Alexandra Hospital – Refurbishments

Healthcare

Princess Alexandra Hospital – Refurbishments

Not every project starts from scratch. Sometimes the most important work is getting an existing building right.

  • 10 Weeks
  • Harlow
Read more
Photo of Actiform Project Princess Alexandra Hospital – Alex Lounge Wellbeing and Office space

Healthcare

Princess Alexandra Hospital – Alex Lounge Wellbeing and Office space

A place for the people who never stop. Built in 14 weeks, without disturbing a single premature baby.

  • Staff welfare and agile workspace
  • 14 weeks
  • Harlow
Read more
Photo of Actiform Project Transportable Endoscopy Unit — TAC Healthcare

Healthcare

Transportable Endoscopy Unit — TAC Healthcare

The carbon neutral endoscopy unit that goes where patients are — not the other way around.

  • £650k
  • 10 Weeks
  • Aberdeen
Read more
Photo of Actiform Project NYE Bevan Unit — Northampton General NHS Trust

Healthcare

NYE Bevan Unit — Northampton General NHS Trust

60 beds. 78 modules. A new way to assess patients — without adding pressure to A&E.

  • £12m
  • 32 weeks
  • Northampton General NHS Trust
Read more