Actiform designed, manufactured and installed a much-needed Outpatients Department (OPD) to ease capacity pressures at Southend University Hospital. Originally conceived as a standalone facility, the scheme was reworked with the Trust to link directly into the existing hospital building — creating 14 modern, HTM/HBN-compliant consulting rooms supported by office and ancillary space, all delivered as a true turnkey solution.
Expertise
- Modular healthcare construction (Off-Site Engineered)
- Patient-flow and operational design review
- HTM/HBN-compliant clinical space
- Building control & planning management (in-house)
- BIM-enabled design and delivery
- Sustainable / low-energy building design
Deliverables
- 14 HTM/HBN-compliant consulting rooms (mix of single and family sizes)
- Supporting office space and ancillary areas
- Physical link into the existing hospital building
- EPC 'A'-rated building with integrated solar panels
- Full turnkey design, manufacture and installation